Weighbridge foundations: what good civil work looks like

Weighbridges2 min read

A weighbridge is only as accurate as the foundation under it. These are the points to check before and during construction.

Even the best deck and load cells give poor readings on a weak or uneven foundation. Good civil work keeps the bridge level, drains water away and gives the load cells a solid base for decades.

Before construction

  • Test the soil and design the foundation for the bridge's capacity
  • Plan straight approaches at both ends
  • Plan drainage so water flows away from the pit or foundation
  • Leave space for the indicator room and cable route

During construction

  • Use the reinforcement and concrete grade specified in the drawing
  • Set load cell base plates exactly level
  • Allow concrete to cure fully before the deck is placed
  • Protect cable ducts from water and rodents

After installation

The bridge is tested with standard weights and verified on site by the Legal Metrology officer before it is used for trade. Keep the approaches clean and level, since potholes at the ends cause trucks to bounce onto the deck.